Customer: Lino Mastrangelo
Project Completed: March 2016
Type of Roof: membrane
Materials: scupper
Location: 1947 St. Georges Ave., North Vancouver
Project Completed: March 2016
Type of Roof: membrane
Materials: scupper
Location: 1947 St. Georges Ave., North Vancouver
On this job the scupper drain was replaced. We began by removing the old scupper and installing a new one. The surrounding membrane was degranulated and prepared for torching. It was then based in. With the waterproofing out of the way, it was time to add a second granular membrane layer.